NEW · PROJECT 02 — BRISBANE WEST, QUEENSLAND
KenvoltCOMPUTE & INFERENCE

PROJECTS

Two projects.
Two continents.

Kenvolt has two projects in development: a modular inference node in Alberta, Canada, and an AI data centre site in Brisbane West, Australia. Each starts from a different strength. Below is what is in hand, and what is not.

PROJECT 01

Our first project.
Alberta, Canada.

A planned modular, liquid-cooled AI inference node in the Medicine Hat region.

In development · Permitting and supply-chain planning

CANADA / ALBERTA01
Regional schematic of the first Kenvolt project in southeastern Alberta One approximate regional marker indicates the Medicine Hat region. The illustration does not identify the project site. ALBERTA BRITISHCOLUMBIA SASKATCHEWAN UNITED STATES Medicine Hat region PROJECT 01 N
Regional illustration · Approximate location only

01 /OUR FIRST DEVELOPMENT

Canada
Token Factory

Medicine Hat region
Alberta, Canada

Our first project pairs secured power availability with a phased, modular approach to AI inference infrastructure.

Land
Cooperation intent established with the landowner.
Power
Power availability secured.
Design
Modular, liquid-cooled inference node within a design envelope of 10 MW or less.
Current stage
Permitting and supply-chain planning.

The project is in development. Delivery remains subject to permitting and final project design.

PROJECT 02

Our second project.
Brisbane West.

An AI data centre site on industrial land in an established estate, about 30 km from the Brisbane CBD.

In development · Site controlled · Power pathway in progress

AUSTRALIA / QUEENSLAND02
Regional schematic of the second Kenvolt project in South East Queensland One approximate regional marker indicates Brisbane West, about 30 km west-south-west of the Brisbane CBD. The illustration is not to scale and does not identify the project site. QUEENSLAND NEW SOUTH WALES CORAL SEA Brisbane CBD Brisbane West PROJECT 02 N
Regional illustration · Approximate location only · Not to scale
2.938haIndustrial land under exclusivity, deposit paid
20 → 48MWPreliminary power pathway, not yet approved
Mar 2031Data centre use approval current to
~30kmTo the Brisbane CBD

02 /OPEN TO A LEAD PARTNER

Brisbane West
AI Data Centre

Brisbane West
Queensland, Australia

A controlled industrial site with an approved data centre use, a preliminary grid connection pathway and a modular delivery plan.

Land
2.938 ha of industrial land in an established estate. Deposit paid; exclusivity secured.
Planning
Data centre use approval, extended in June 2026, current to 26 March 2031.
Power
A preliminary response from the network operator, Energex, sets out a 48 MW connection pathway. A first stage of about 20 MW would use a 500–700 m extension of an existing 33 kV feeder.
Flooding
No recorded inundation in the 1974, 2011 or 2022 flood events, according to the council flood report.
Delivery approach
A prefabricated shell plus modular liquid-cooled compute units, brought live in batches once energised.
Partnering
Kenvolt is seeking a strategic partner — a data centre operator, developer or infrastructure investor — to take the lead role.
Current stage
Site controlled; power pathway in progress.

The project is in development. Delivery remains subject to power connection, financing and final design.

The 48 MW pathway is a preliminary response from the network operator and is not yet approved. The first stage of about 20 MW is subject to the operator’s written confirmation.

A FOCUSED CONVERSATION

Explore the
opportunity.

We welcome focused conversations with infrastructure partners, prospective capacity customers and long-term capital partners.

Contact Kenvolt