PROJECT 01
Our first project.
Alberta, Canada.
A planned modular, liquid-cooled AI inference node in the Medicine Hat region.
In development · Permitting and supply-chain planning
01 /OUR FIRST DEVELOPMENT
Canada
Token Factory
Medicine Hat region
Alberta, Canada
Our first project pairs secured power availability with a phased, modular approach to AI inference infrastructure.
- Land
- Cooperation intent established with the landowner.
- Power
- Power availability secured.
- Design
- Modular, liquid-cooled inference node within a design envelope of 10 MW or less.
- Current stage
- Permitting and supply-chain planning.
The project is in development. Delivery remains subject to permitting and final project design.
PROJECT 02
Our second project.
Brisbane West.
An AI data centre site on industrial land in an established estate, about 30 km from the Brisbane CBD.
In development · Site controlled · Power pathway in progress
02 /OPEN TO A LEAD PARTNER
Brisbane West
AI Data Centre
Brisbane West
Queensland, Australia
A controlled industrial site with an approved data centre use, a preliminary grid connection pathway and a modular delivery plan.
- Land
- 2.938 ha of industrial land in an established estate. Deposit paid; exclusivity secured.
- Planning
- Data centre use approval, extended in June 2026, current to 26 March 2031.
- Power
- A preliminary response from the network operator, Energex, sets out a 48 MW connection pathway. A first stage of about 20 MW would use a 500–700 m extension of an existing 33 kV feeder.
- Flooding
- No recorded inundation in the 1974, 2011 or 2022 flood events, according to the council flood report.
- Delivery approach
- A prefabricated shell plus modular liquid-cooled compute units, brought live in batches once energised.
- Partnering
- Kenvolt is seeking a strategic partner — a data centre operator, developer or infrastructure investor — to take the lead role.
- Current stage
- Site controlled; power pathway in progress.
The project is in development. Delivery remains subject to power connection, financing and final design.
The 48 MW pathway is a preliminary response from the network operator and is not yet approved. The first stage of about 20 MW is subject to the operator’s written confirmation.
A FOCUSED CONVERSATION
Explore the
opportunity.
We welcome focused conversations with infrastructure partners, prospective capacity customers and long-term capital partners.
Contact Kenvolt